RELIANZ Mining Solutions.
SERVICE FOR SURFACE PREPARATION AND APPLICATION OF PROTECTIVE COATING ON CRANE BRIDGES LOCATED IN THE RECTIFICATION WORKSHOP.
.
Performed activities:
Assembling and safe mounting of the multidirectional certified scaffold that covers the surface of the Beam Rail.
SSPC-SP3 grade surface preparation and coating application in a two-layer system (One layer of epoxy primer at 4 mills thick and One layer of urethane enamel at 3 mills thick) of Viga Riel
.
.




























DYNAMOMETER CHIMNEY MAINTENANCE SERVICE
.
Performed activities:
Safe assembly and assembly of certified multidirectional scaffolding around chimneys.
Metalworking repair and tensioner change.
SSPC-SP3 grade surface preparation and coating application in a two-layer system (One layer of epoxy primer at 4 mills thick and One layer of urethane enamel at 3 mills thick).
.
.
MANUFACTURING AND ASSEMBLY SERVICE OF THE ACCESS LADDER TO THE ROOF OF THE BUILDING. OF PAINTING AND MANUFACTURING
.
Performed activities:
Design and structural analysis of the stairs.
Manufacture and galvanizing of the stair elements.
Pre-setup and logistics of materials and equipment.
Manufacture of the shoes and pedestals.
Arming and safe assembly of the multidirectional certified scaffold.
Installation of structure of the stairs.
Torque of the anchor bolts of
Assembling the racks and steps.
.