RELIANZ Mining Solutions.

SERVICE FOR SURFACE PREPARATION AND APPLICATION OF PROTECTIVE COATING ON CRANE BRIDGES LOCATED IN THE RECTIFICATION WORKSHOP.

.

Performed activities:

  • Assembling and safe mounting of the multidirectional certified scaffold that covers the surface of the Beam Rail.

  • SSPC-SP3 grade surface preparation and coating application in a two-layer system (One layer of epoxy primer at 4 mills thick and One layer of urethane enamel at 3 mills thick) of Viga Riel

.

.

DYNAMOMETER CHIMNEY MAINTENANCE SERVICE

.

Performed activities:

  • Safe assembly and assembly of certified multidirectional scaffolding around chimneys.

  • Metalworking repair and tensioner change.

  • SSPC-SP3 grade surface preparation and coating application in a two-layer system (One layer of epoxy primer at 4 mills thick and One layer of urethane enamel at 3 mills thick).

.

.

MANUFACTURING AND ASSEMBLY SERVICE OF THE ACCESS LADDER TO THE ROOF OF THE BUILDING. OF PAINTING AND MANUFACTURING

.

Performed activities:

  • Design and structural analysis of the stairs.

  • Manufacture and galvanizing of the stair elements.

  • Pre-setup and logistics of materials and equipment.

  • Manufacture of the shoes and pedestals.

  • Arming and safe assembly of the multidirectional certified scaffold.

  • Installation of structure of the stairs.

  • Torque of the anchor bolts of

  • Assembling the racks and steps.

.