EXECUTED PROJECTS
GECELCA SAESP
.
.
Metal surface preparation and application of all types of coatings
.
Coatings applied: immersion, high temperature, polyurethanes, epoxies, etc.
Approximate area: 45 thousand mt2
Intervened equipment: boiler belts, boiler structure, coal hoppers, pipes, pumps and turbo-group equipment, pipe racks, ducts, motors, condensers, valves, various pipes, roof structure, assembly of all kinds of certified scaffolding, etc.
.
.
![]() Rack de tuberías de enfriamiento y tanque de agua cruda (Antes) | ![]() Rack de tuberías de enfriamiento y tanque de agua cruda (Después) | ![]() Desgasificadores planta de agua (Antes) |
---|---|---|
![]() Desgasificadores planta de agua (Después) | ![]() Estacion reductora de gas (Antes) | ![]() Estacion reductora de gas (Después) |
![]() Tiro forzado A, Unidad 2 (Antes) | ![]() Tiro forzado A, Unidad 2 (Después) | ![]() Planta de agua (Antes) |
![]() Planta de agua (Después) | ![]() Rack de tuberías de planta de agua (Antes) | ![]() Rack de tuberías de planta de agua (Después) |
![]() Rack de tuberías detrás del edificio administrativo | ![]() Alimentadores de carbon, Unidad 1 | ![]() Pintura - 2011 - Tuberías de agua cruda y soportes ubicados en el puente sobre el río Cañas |
![]() Enfriadores de coginetes, Unidad 2 | ![]() Tanque de aceite de turbina, Unidad 1 | ![]() Estructura de caldera 1 |
![]() Estructura de soporte, Banda transp. de carbón | ![]() Pared de tolvas, Unidad 1 | ![]() Tanque de ACPM |
![]() Tolvas de carbón, Unidad 1 |
Changing the structure of the TB1 AND TB2 conveyor belts
.
Performed activities:
.
Setting up the porches (scaffolding and bracing)
Surface Preparation (SSPC - SP3) and Industrial Porch Coating Application
Remove the TB1 modules and gantries and TB2 modules.
Manufacture of the structure to be installed.
Assembly of gantries, modules, roller supports and belt cover.
.
.
.
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
Rental, assembly and disassembly service of multidirectional scaffolding in the home of the steam generator of Unit No.1 of the Termoguajira Power Plant
.
Performed activities:
Assembly and disassembly of multidirectional scaffolding 35 meters high on the internal perimeter of the boiler of unit 1
.
.
Rehabilitation service of 300 square meters of grills and 1000 linear meters of safety railings of the Termoguajira power plant (GECELCA SA ESP)
.
Performed activities:
.
Manufacture of grills and railings
Disassemble items in poor condition
Assembly of the new elements.
.
.