top of page

EXECUTED PROJECTS

GECELCA SAESP

.

.

Metal surface preparation and application of all types of coatings

.

Coatings applied: immersion, high temperature, polyurethanes, epoxies, etc.

Approximate area: 45 thousand mt2

Intervened equipment: boiler belts, boiler structure, coal hoppers, pipes, pumps and turbo-group equipment, pipe racks, ducts, motors, condensers, valves, various pipes, roof structure, assembly of all kinds of certified scaffolding, etc.

.

.

Rack de tuberías de enfriamiento y tanque de agua cruda (Antes)

Rack de tuberías de enfriamiento y tanque de agua cruda (Después)

Desgasificadores planta de agua (Antes)

Desgasificadores planta de agua (Después)

Estacion reductora de gas (Antes)

Estacion reductora de gas (Después)

Tiro forzado A, Unidad 2 (Antes)

Tiro forzado A, Unidad 2 (Después)

Planta de agua (Antes)

Planta de agua (Después)

Rack de tuberías de planta de agua (Antes)

Rack de tuberías de planta de agua (Después)

Rack de tuberías detrás del edificio administrativo

Alimentadores de carbon, Unidad 1

Pintura - 2011 - Tuberías de agua cruda y soportes ubicados en el puente sobre el río Cañas

Enfriadores de coginetes, Unidad 2

Tanque de aceite de turbina, Unidad 1

Estructura de caldera 1

Estructura de soporte, Banda transp. de carbón

Pared de tolvas, Unidad 1

Tanque de ACPM

Tolvas de carbón, Unidad 1

Changing the structure of the TB1 AND TB2 conveyor belts

.

Performed activities:

.

  1. Setting up the porches (scaffolding and bracing)

  2. Surface Preparation (SSPC - SP3) and Industrial Porch Coating Application

  3. Remove the TB1 modules and gantries and TB2 modules.

  4. Manufacture of the structure to be installed.

  5. Assembly of gantries, modules, roller supports and belt cover.

.

.

.

Rental, assembly and disassembly service of multidirectional scaffolding in the home of the steam generator of Unit No.1 of the Termoguajira Power Plant

.

Performed activities:

Assembly and disassembly of multidirectional scaffolding 35 meters high on the internal perimeter of the boiler of unit 1

.

.

Rehabilitation service of 300 square meters of grills and 1000 linear meters of safety railings of the Termoguajira power plant (GECELCA SA ESP)

.

Performed activities:

.

  1. Manufacture of grills and railings

  2. Disassemble items in poor condition

  3. Assembly of the new elements.

.

.

bottom of page